[Construction Example] Shortened construction period for embankment work (coastal protection and greening work in one process)
Corresponds to a flow velocity of 5 m/s up to the vegetation area! Demonstrates high-level bank protection functionality immediately after construction.
This is a case study of the installation of the grass-covered geotextile "Grit Saver" at the Hiji River embankment construction in the Suda area. The project was commissioned by the Ozu Civil Engineering Office and carried out in Ehime Prefecture. The product was installed in areas with a flow velocity of 3 to 5 m/s, which were previously unembanked. This method allows for the completion of both bank protection and greening work in a single process, thereby shortening the construction period. [Case Overview] ■ Project Name: Hiji River Embankment Construction, Suda Area ■ Location: Ehime Prefecture ■ Construction Date: July 2023 (Year 5 of Reiwa) ■ Quantity: 4,400 m² ■ Purpose: Other *For more details, please refer to the related links or feel free to contact us.
- Company:日本植生
- Price:Other